Summary
Primary Responsibilities
-
You will serve as the senior technical lead for electrical design on complex, large-scale data center and mission-critical infrastructure projects, guiding projects from concept through commissioning and final turnover.
-
You will lead and oversee a team of electrical engineers and designers, establishing consistent design standards, reviewing deliverables, and fostering a culture of continuous improvement and technical excellence.
-
You will act as the primary liaison between internal departments, engineers of record (EoR), external consultants, and contractors to resolve complex electrical design challenges and drive timely, code-compliant solutions.
-
You will oversee the development, review, and quality control of all electrical documentation including one-line diagrams, load calculations, panel schedules, arc flash studies, short circuit analyses, submittals, and RFIs.
-
You will lead the evaluation and integration of emerging technologies to enhance the efficiency, reliability, and scalability of electrical infrastructure in data center environments.
-
You will drive proactive schedule and budget management by identifying design bottlenecks, evaluating cost impacts of design changes, and maintaining accountability across EoR and contractor teams.
-
You will ensure all electrical systems fully comply with applicable codes and standards including NEC, IEEE, and IEC, while mitigating technical and project risk throughout the design lifecycle.
-
You will lead risk assessments, factory acceptance testing (FAT), site acceptance testing (SAT), and commissioning activities, including milestone inspections and system integration verification.
-
You will partner closely with mechanical, controls, and architectural disciplines to ensure full integration of electrical systems into the broader project design framework.
-
You will develop and maintain lessons-learned documentation, contributing to ongoing improvements in design processes, standards, and project delivery methodologies.
-
You will provide field support during construction, conducting walkthroughs, resolving installation issues, and ensuring a successful handoff to operations.
-
You will contribute to the development and continuous refinement of internal design standards, templates, and best practices across the electrical discipline.
Skills, Knowledge, Education, and Experience
-
Bachelor’s degree in Electrical Engineering or Power Engineering with electrical building systems emphasis.
-
Minimum 10 years’ experience in the A/E industry with a strong focus on mission-critical and data center electrical infrastructure.
-
Revit BIM design experience required; demonstrated ability to coordinate large-scale electrical systems within a BIM environment.
-
Deep expertise in power distribution and lighting design, including medium voltage switchgear, transformers, UPS systems, generators, and associated controls.
-
Proven proficiency in short circuit analysis and power system modeling using SKM, ETAP, or similar tools.
-
Extensive background in the design, construction, testing, and commissioning of medium and low voltage electrical distribution systems, including power management and SCADA tools.
-
Professional Engineering (PE) license required.
-
Demonstrated experience with redundancy strategies (N, N+1, 2N) and fault-tolerant design principles for high-uptime data center environments.
-
Strong understanding of substation design, switchgear, power monitoring, and associated commissioning processes.
-
Comprehensive understanding of professional services from conceptual design through project close-out.
-
Knowledge of sustainable design approaches including energy efficiency strategies and their application in large-scale infrastructure.
-
Exceptional written and verbal communication skills with the ability to convey complex technical concepts to diverse audiences including senior leadership and external stakeholders.
-
Passion for improving workflows and driving continuous improvement across the electrical discipline.
-
Proficient with Microsoft Productivity Suite products.
- Work permits
- United States
- Timezones
- United States
- Education
- bachelor degree and professional certificate
- Experience
- 10+ years